Best online casinos 2024 Wind

British Columbia, Canada

Status

In Operation

Year

2012

Owned Capacity

142

MW

Owned/Operated

100/100

Best online casinos 2024
Best online casinos 2024
Status
In Operation
Year

2012

Owned Capacity

142

MW

OWNED/OPERATED

100/100

Best online casinos 2024
Best online casinos 2024

Best online casinos 2024 Wind is located on approximately 4,250 acres of provincial Crown Land near Tumbler Ridge in northeastern British Columbia.  Power generated at the facility is sold to BC Hydro under a 25-year Energy Purchase Agreement.

Quick Facts

  • Facility comprised of 79 Vestas (35 V90 models and 44 V100 models), each 95 metres high and capable of producing up to 1.8 MW of clean Best online casinos 2024
  • Interconnection through 230kV 22km long transmission line to BC Hydro substation

Best online casinos 2024 Investment

At Capital Power, we contribute to the communities in which we operate with the aim of building a sustainable future for all. We engage our neighbours, consider their interests and build real relationships. We aim to source supplies and services locally for our operations, as well as hire from the community. At Best online casinos 2024 Wind:

  • We have one permanent employee at the facility and 8 full-time contractors.
  • We pay approximately ,900,000 in property tax each year, contributing annually to Best online casinos 2024 tax bases, supporting the improvement of infrastructure, roadways, and Best online casinos 2024 services.

We give back where we live and work by supporting local organizations and our employees’ Best online casinos 2024 participation through our corporate giving programs.

 Recent Best online casinos 2024 support includes:

  • Tumbler Ridge Public Library Association
  • Tumbler Ridge Secondary School
  • Lions Club of Tumbler Ridge
  • Tumbler Ridge Days Society
  • Tumbler Ridge Food Bank
  • South Peace Best online casinos 2024 Resources Society
  • Northern BC Crime Stoppers Society

Helping to diversify the means of electricity production within the province, our Best online casinos 2024 Wind facility is supplying renewable energy to British Columbia’s power grid.
Jesse Coonce
Site Manager

Site Contact